YRBM 39 is one of the Navy's non self-propelled Repair, Berthing and Messing Barges.
General Characteristics: | Awarded: September 22, 1980 |
Keel laid: July 27, 1981 | |
Launched: April 6, 1982 | |
Delivered: August 1, 1982 | |
Builder: Marinette Marine, Marinette, Wi. | |
Length: 146 feet (44.3 meters) | |
Beam: 46 feet (14 meters) | |
Draft: 4 feet (1.2 meters) | |
Displacement: approx. 650 tons | |
Accommodations: 26 Officers, 30 Chief Petty Officers, 201 Enlisted | |
Homeport: San Diego, Calif. |
YRBM 39 Image Gallery:
The photos below were taken by me and show YRBM 39 at Naval Base San Diego, Calif., on September 29, 2011 (first photo) and September 30, 2011 (second photo).
The photo below was taken by me and shows YRBM 39 at San Diego, Calif., on October 4, 2012.
The photos below were taken by Michael Jenning and show YRBM 39 alongside the USS LAKE ERIE (CG 70) at Naval Base San Diego, Calif., on October 2, 2015.
The photo below was taken by Michael Jenning and shows YRBM 39 alongside USS COMSTOCK (LSD 45) at the Huntington Ingalls Industries (HII) Continental Maritime of San Diego shipyard on October 11, 2017.
The photo below was taken by Michael Jenning and shows YRBM 39 at San Diego, Calif., on March 2, 2019.